Sewer & Water Disconnection for Demolition

Code-Compliant Disconnection Required Before Any NYC Demolition

NYC demolition cannot begin until all existing utility connections are fully terminated. This includes cutting, capping, and permanently disabling both the water service line and the house sewer at city-approved locations.

Lady Liberty Contracting Corp performs DEP-approved termination, controlled excavation, and full restoration so demolition permits can move forward without delay.

Sewer and Water Disconnection for Demolition in NYC

Construction workers inspecting pipeline on urban construction site, wearing safety gear, city skyline in background.

Why Proper Disconnection Is Mandatory

Prevent Water Leakage During Demolition

Old service lines must be cut and sealed to avoid uncontrolled flooding.

Prevent Sewage Discharge

Uncapped sewers can release wastewater into the demolition site.

Satisfy DEP & DOB Requirements

NYC requires official disconnection approval before demolition starts.

Prepare Site for Future Construction

Clean termination simplifies installation of new sewer and water mains.

What Our Disconnection Service Includes

Construction worker repairing underground water pipe in trench.

Locate Existing Sewer & Water Lines

Identify exact city tie-in points to determine termination area.

Controlled Excavation

Expose lines safely without disturbing surrounding utilities.

Cutting, Capping & Plugging

Terminate lines at approved curb or connection points per NYC code.

Full Permit Management

DEP, DOT, and utility coordination handled end-to-end.

Inspection & Sign-Off

We coordinate official verification and obtain approval for demolition.

Surface Restoration

Sidewalks, asphalt, yards, and soil restored to safe condition.

Construction workers using excavator for sidewalk repair, safety cones, and barriers in residential street, August 2024.

Get Started Today

Call (718) 965-3500

How Sewer & Water Disconnection Works

1Utility Review & Site Assessment

Team reviews existing sewer/water entry points, prior records, and DEP requirements. Confirms routing, depth, and potential conflicts with nearby utilities.

2Permit Filing & Agency Coordination

Lady Liberty secures all required approvals: DEP Water Service Termination Permit DEP Sewer Plug Permit DOT Street/Sidewalk Opening Permit Required utility mark-outs (gas, electric, fiber) All paperwork handled before excavation.

3Controlled Excavation to Reach Connection Points

Excavation opens a targeted trench at the curb line or roadway to expose both the sewer and water service lines. Shoring installed where depth requires stabilizatio

4Permanent Termination & Sealing

Crews perform: Cut & cap water service line at the city-approved location Plug or cap sewer connection at curb or main entry Remove unsafe remnants Install proper fittings per DEP specifications Termination ensures no live utility remains entering the structure.

5Inspection & Official DEP Closure

DEP or DOB inspector verifies terminations. Once approved, disconnection is recorded and demolition may proceed.

6Backfill & Surface Restoration

Trench is compacted in layers. Surfaces restored: Asphalt Sidewalk slabs Soil or landscaping Site left safe and demolition-ready.