Sewer & Water Disconnection for Demolition

Code-Compliant Disconnection Required Before Any NYC Demolition

NYC demolition cannot begin until all existing utility connections are fully terminated. This includes cutting, capping, and permanently disabling both the water service line and the sewer at city-approved locations.

Lady Liberty Contracting Corp performs DEP-approved termination, controlled excavation, and full restoration so demolition permits can move forward without delay.

Sewer and Water Disconnection for Demolition in NYC

Credentials, guarantees and permits

What we can show you in writing before any work starts.

Licensed, bonded & insuredFully licensed, bonded and insured for water main and sewer work in New York City.
Master Plumber in-houseWork is performed under a New York City Licensed Master Plumber on staff — not subcontracted out.
10-year workmanship guaranteeEvery installation and repair is backed by our 10-year workmanship guarantee.
Certified WBEA woman-owned business, certified as a Women’s Business Enterprise.
Is Lady Liberty licensed, bonded and insured?

Yes. Lady Liberty Contracting Corp is fully licensed, bonded and insured for water main and sewer work throughout New York City. Certificates of insurance and licence details are available on request before any work begins.

Who actually performs the work — is any of it subcontracted?

The work is carried out under a New York City Licensed Master Plumber on our own staff, not subcontracted to another firm. That matters on permitted work, because the DEP and DOT filings are pulled under the licence of the plumber responsible for the job.

Do you guarantee your work?

Yes. Every installation and repair carries a 10-year workmanship guarantee. If an issue arises that relates to our work, we come back and put it right.

Do you handle the DEP and DOT permits, or is that on me?

We handle them. Permit filing, inspections and sign-off are managed in-house as part of the job, including street-opening permits and the restoration that follows.

Do you offer financing or payment plans?

Yes. Water main and sewer replacements are large, unplanned expenses, and payment options are available. See financing and flexible payment options.

What kind of work do you take on — and what don’t you?

We work on the water and sewer lines that connect a property to the city main: service line repairs and replacements, sewer laterals, excavation, DEP and DOT permitted work, and the street and sidewalk restoration afterwards. That covers residential, commercial and municipal properties across all five boroughs. We do not take on interior plumbing — in-house leaks, fixtures, heating or boiler work.

Why Proper Disconnection Is Mandatory

Prevent Water Leakage During Demolition

Old service lines must be cut and sealed to avoid uncontrolled flooding.

Prevent Sewage Discharge

Uncapped sewers can release wastewater into the demolition site.

Satisfy DEP & DOB Requirements

NYC requires official disconnection approval before demolition starts.

Prepare Site for Future Construction

Clean termination simplifies installation of new sewer and water mains.

What Our Disconnection Service Includes

Construction worker repairing underground water pipe in trench wearing safety vest and boots.

Locate Existing Sewer & Water Lines

Identify exact city tie-in points to determine termination area.

Controlled Excavation

Expose lines safely without disturbing surrounding utilities.

Cutting, Capping & Plugging

Terminate lines at approved curb or connection points per NYC code.

Full Permit Management

DEP, DOT, and utility coordination handled end-to-end.

Inspection & Sign-Off

We coordinate official verification and obtain approval for demolition.

Surface Restoration

Sidewalks, asphalt, yards, and soil restored to safe condition.

How Sewer & Water Disconnection Works

1Utility Review & Site Assessment

Team reviews existing sewer/water entry points, prior records, and DEP requirements. Confirms routing, depth, and potential conflicts with nearby utilities.

2Permit Filing & Agency Coordination

Lady Liberty secures all required approvals: DEP Water Service Termination Permit DEP Sewer Plug Permit DOT Street/Sidewalk Opening Permit Required utility mark-outs (gas, electric, fiber) All paperwork handled before excavation.

3Controlled Excavation to Reach Connection Points

Excavation opens a targeted trench at the curb line or roadway to expose both the sewer and water service lines. Shoring installed where depth requires stabilizatio

4Permanent Termination & Sealing

Crews perform: Cut & cap water service line at the city-approved location Plug or cap sewer connection at curb or main entry Remove unsafe remnants Install proper fittings per DEP specifications Termination ensures no live utility remains entering the structure.

5Inspection & Official DEP Closure

DEP or DOB inspector verifies terminations. Once approved, disconnection is recorded and demolition may proceed.

6Backfill & Surface Restoration

Trench is compacted in layers. Surfaces restored: Asphalt Sidewalk slabs Soil or landscaping Site left safe and demolition-ready.